Elevator installation service
Integrated services, customized scene adaptation
Integrated full-chain service
Trinity design
The steel structure shaft, curtain wall system, and elevator pre-assembly are designed simultaneously, relying on BIM technology to achieve three-dimensional collaboration among "architecture, structure, and electromechanical systems" and reduce on-site conflicts.
‌工厂化智造
自建智能工厂完成90%构件预制(含高强度螺栓、幕墙单元),焊缝100%超声波探伤,防腐涂层厚度达200μm(超国标30%)。
Customized scene adaptation
  • The corridor path is optimized for flat-level entry
  • Half-layer docking
Typical scenario application
  • Renovation of old brick-concrete house
  • Commercial and residential building along the street